Optimization of Automization Control Project Progress Based on MS Project

Optimization of Automization Control Project Progress Based on MS Project

Yunhai Hou, Lei Wang

COMPUTER MODELLING & NEW TECHNOLOGIES 2014 18(12C) 624-628

School of Electrical & Electric Engineering, Changchun University of Technology, 130012, Changchun, China

This paper first states theory of project control and theory and method of project progress management, introduced the project management software MS Project; then it introduced the scientific research project management system of institute A, platform C project as well as platform automization control project in detail. Moreover, it used MS Project to make integral WBS decomposition on automization control project of platform C in institute A, found out critical path of automization control project and proposed and concluded various typical problems; after that, the proposed optimization idea and method were applied to make progress optimization on automization control project, and abstract work and WBS decomposition of detailed project were given out after optimization; at last, automization control project of platform C was compared before and after optimization in aspects of project schedule, network planning of project, project personnel and the new added parts after optimization. Finally, it was concluded that, the significantly reduced time limit of automization control project of platform C after optimization was feasible. Afterwards, it analyzed two aspects that affect scientific research progress, that is, plan of scientific research project and personnel management problems of scientific research project and some opinions and suggestions were given out.